Does AMR Elevator Integration Require Retrofitting Existing Factory Elevators? A Real Case from Zhejiang REEMAN
REEMAN, at a smart manufacturing factory in Zhejiang, connected the Fly Boat AMR to the existing factory elevator by installing an elevator control module, with no structural modifications. Deployment was completed in one day, enabling automated cross-floor material transport from the first to the fourth-floor warehouse. Each trip carries parts bins of about 50–100 kg, and after deployment the system completes about 50–70 full round trips per day, with the narrowest aisle at about 1.2 meters and an actual one-way transport time of about 9 minutes. This solution requires first confirming compatibility with the elevator control interface and assessing the elevator's dimensions, load capacity, and safety requirements.
Source: 锐曼REEMAN · reemanbot.com
This page provides a summary and source link only. Read the full article at the source.