Tianjin Port ART completes loaded-out loaded-back cycle, utilization up 19.8%
What happened
Tianjin Port's Second Container Terminal optimized the scheduling algorithm for its Autonomous Transport Robots (ART), completing a "loaded-out loaded-back" operation: after robots deliver export containers for loading onto ships, they no longer return empty but directly pick up import containers back to the yard. The latest version of the scheduling algorithm was completed in April this year and successfully implemented in actual vessel operations. On the day the vessel "Changzheng" berthed for operations, the robots' "double-loaded" running ratio reached 29%, and equipment utilization increased by 19.8%. The terminal said the next step is to further refine the system and equipment to minimize manual intervention as much as possible.
AI 根据报道生成 · 3 days ago更新
Reporting timeline
Follow the reporting to explore different perspectives.
- 机器人全球资讯 · 微信公众号Tianjin Port's intelligent transport robots achieve loaded round trips, boosting equipment utilization by 19.8%
The intelligent transport robots (ART) at Tianjin Port's Second Container Terminal gained a new loaded round-trip capability this year, allowing them to carry export containers to the ship and then pick up import containers on the return trip to the yard, reducing empty runs. On the day the Changzheng vessel berthed for operations this year, the proportion of dual loaded runs reached 29%, and equipment utilization rose by 19.8%.
Activity for this event
- Current
- 3
- Peak
- 6Nov 26 03:00
- Past 24 hours
- -49%
The trend compares participants observed throughout the same period, so its range may be smaller than the current interest count. Move or tap to inspect each hour; use the arrow keys on a keyboard.