Article
Interpretable Collision Avoidance and Feasibility Guarantees via an Uncertainty-Aware Pipeline
The study proposes a modular perception-prediction-planning pipeline that propagates uncertainty as structured, interpretable quantities across modules and guarantees a feasible solution in every cycle within convex safe sets. In Monte Carlo trials at a four-way unsignalized intersection, the pipeline achieved 0% collisions and 0% solver infeasibility, with 12.7 ms per cycle; the deterministic planner and chance-constrained baseline had collision rates of 36% and 10%, respectively. Ablation experiments confirmed the necessity of each uncertainty source, and a hardware deployment on a Clearpath Jackal UGV verified real-time feasibility.
Part of the event: Uncertainty-aware collision avoidance pipeline achieves zero collisions
This page provides a summary and source link only.